A batch of farmed sea bass, a delivery from the fish auction, a pallet of vacuum-packed fillets: three products, three different ways of losing track of a batch. In the seafood industry the raw material is alive or freshly dead, its weight changes with every weighing, its shelf life is counted in days, and the European regulatory framework has just tightened. Since 10 January 2026, the amended Fisheries Control Regulation requires every operator, from catch or harvest through to retail, to keep batch-level traceability and pass it digitally to the next operator in the chain.
This article is written for managers, quality leads and finance directors at fish farms, shellfish growers, wholesalers, auction houses and seafood processors. It covers what makes a generic ERP insufficient, the obligations you need to equip for, and how to select and deploy the right solution. For general food batch traceability, see our food industry ERP comparison. Here we stay on what is specific to water.
Sector specifics: living stock, seasonality, catch weight, short shelf life
Five constraints set seafood apart from standard food manufacturing, and each one has a direct impact on how the ERP is configured.
Living stock. A farmed fish or a batch of shellfish is a biological asset: it grows, it dies, it feeds. Stock value changes without any physical movement. A trading-oriented ERP cannot represent this.
Seasonality and uncertainty. Supply depends on sea conditions, quotas, farming cycles and spawning periods. Daily volumes are unpredictable, which makes conventional forecast-driven MRP of limited use on the fishing purchase side.
Catch weight and dual units. A whole fish is sold by the piece or by the kilo, graded by size and invoiced on actual net weight. The same item must carry two units (pieces and kg) with the real weight recorded at every movement, not a standard weight. This is the most frequent source of stock and margin discrepancies in poorly scoped projects.
Short shelf life. Fresh product is measured in days, sometimes hours. Stock must be managed FEFO (first expired, first out), with automatic alerts and rotation that sales can see in real time.
Volatile prices. The auction purchase price changes daily, sometimes by the batch. The selling price follows with a lag. Margin can only be managed by batch, never on an average item cost.
Traceability regulation (EU, labelling, origin, fishing gear and area)
Several texts overlap. Before you equip anything, you need to know which one requires what.
The amended Fisheries Control Regulation (EU) 2023/2842
Regulation (EU) 2023/2842 amended Regulation (EC) No 1224/2009. Its Article 1 applies from 10 January 2026, with some derogations (certain points only apply from 10 January 2028). The new Article 58 sets the principle: fishery and aquaculture products must be put into batches by operators and be traceable at all stages of production, processing and distribution, from catch or harvest to retail. Each batch must be adequately marked.
For batches covered by Chapter 3 of the Combined Nomenclature (fish, crustaceans, molluscs), Article 58 lists a minimum set of information that must accompany the batch:
- the batch identification number;
- for a non-imported product: the trip or fishing-day number or, for aquaculture, the name and registration number of the producer or production unit;
- for an imported product: the vessel identifier (IMO number where applicable) and the catch certificate number or, for aquaculture, the production unit;
- the FAO alpha-3 species code and the scientific name;
- the geographical area of catch, or the production area for freshwater and aquaculture;
- for fisheries, the gear category;
- the date(s) of catch or harvest;
- quantities in kilograms of net weight, or the number of individuals;
- quantities below the minimum conservation reference size, where relevant, and information related to marketing standards.
Operators must keep this information and make it available digitally to the operator to whom they supply the product, and to the competent authorities on request. For products under headings 1604 and 1605 (preserved fish and prepared products), delegated acts will set requirements that apply from 10 January 2029 according to the regulation.
Weighing and sales notes
The same regulation requires fishery products to be weighed, by species, immediately after landing, on weighing systems approved by the competent authorities, before any storage, transport or placing on the market (Article 60). Sales notes (Articles 62 to 64) include the trip number, vessel identifier, area, quantities per species and buyer identification. For an auction house or a wholesaler, this means first-sale data must flow into the ERP without re-keying, at the right level of granularity.
Consumer labelling: Regulation (EU) No 1379/2013
Article 35 of Regulation (EU) No 1379/2013 requires, for sale to the final consumer: the commercial designation and scientific name of the species, the production method (caught, caught in fresh water, farmed), the catch area or country of farming, the fishing gear category, the “defrosted” statement where applicable, and the date of minimum durability. Article 38 specifies the area: the FAO area for sea fish, and for aquaculture the Member State or third country where the product reached more than half of its final weight (or spent more than half of its rearing period).
General food safety rules
Regulation (EC) No 178/2002 remains the foundation: identification of supplier and customer, withdrawal and recall of non-compliant products. Regulation (EC) No 852/2004 requires procedures based on HACCP principles. On top of that come the hygiene rules for products of animal origin in Regulation (EC) No 853/2004, including those specific to fishery products. Check case by case depending on your status (health approval, depuration plant, auction).
Imports and the fight against illegal fishing
For imported products, the CATCH IT tool has been used by EU importers to submit catch certificates since 10 January 2026. A processor sourcing outside the EU must therefore attach the certificate number to every batch received.
Aquaculture: farming cycles, biomass, feed, mortality, biological asset valuation
An aquaculture ERP must treat the production unit (tank, cage, longline, oyster pond) as a first-class object, with its own cycle.
- Farming batches. Each stocking of fry or spat creates a batch, tied to a production unit, with its dates, origin (hatchery) and headcount.
- Estimated biomass. Headcount x average weight, recalibrated at each sample weighing. The ERP must accept estimates and trace their corrections.
- Feeding. Feed consumption by batch and unit, feed conversion ratio, cumulative feed cost. This is the first cost item in fish farming and must be allocated to the batch, not smoothed.
- Mortality. Daily recording, causes, impact on headcount and biomass. Unrecorded mortality distorts stock and margin.
- Treatments and withdrawal periods. Veterinary medicines, treatment dates, pre-harvest withdrawal periods: this data must block a batch from sale until the period has elapsed.
- Harvest. Harvest turns a biological batch into product batches (grades, presentations), which carry the producer registration number required by Article 58.
Sensors (oxygen, temperature, salinity) usually feed a dedicated monitoring system. The ERP does not need to store everything: it should receive the useful events (alerts, reference readings) and link them to the batch.
Fishing and wholesale: auction purchasing, batches, splitting, grading, yield
A note on quotas: they are allocated to vessels and producer organisations, not to wholesalers. The wholesaler therefore does not manage the quota, but receives batches whose origin (vessel, trip, area, species) is the anchor for control. An ERP for a fisher or producer organisation, on the other hand, adds tracking of declared catches against fishing opportunities, to be confirmed with your organisation.
For the wholesaler the cycle is short and dense: purchase at auction or on the quay, receipt, sorting, grading, possibly cutting, dispatch, often the same day.
- Auction purchasing. Purchased lots arrive with their first-sale data (vessel, trip, area, gear, date, weight). An interface with the auction system avoids re-keying, the first cause of linking errors.
- Splitting. A purchase batch is split into sales batches (by grade, by customer). The ERP must keep the parent-child link so that every batch sold can be traced back to its trip.
- Pooling. Conversely, two purchases of the same species pooled in one crate create a composite batch. The composition rule must be traced, never lost.
- Grading and sorting. Grade drives price. Average weight per piece, number of pieces and net weight must be recorded at each step.
- Yield. Incoming weight, outgoing weight, losses (water, trimmings, weighing differences): yield by species and by supplier is a central management indicator for the wholesaler.
Processing: material yield, co-products, HACCP
In a processing plant (filleting, smoking, curing, prepared dishes), the ERP must support:
- material yield by species and presentation (whole, gutted, fillet, skinless fillet), with theoretical yields compared against actual yields;
- co-products (heads, bones, skins, trimmings): they have value, a destination (valorisation, animal by-products) and their own traceability obligations. The ERP must generate them at production declaration with a consistent cost allocation;
- HACCP control points: receiving, storage and process temperatures, cleaning, laboratory checks. Records must be linked to the batches concerned. For some species, specific food safety criteria exist (for example histamine for at-risk fish, under Regulation (EC) No 2073/2005): an out-of-limit lab result must be able to block the batch in the ERP;
- marking: batch number, date and mandatory statements printed by labelling machines driven by the ERP rather than keyed by hand.
Cold chain and shelf life: alerts and batch recalls
The cold chain is traceability data in its own right. Temperature probes and loggers in cold rooms, trucks and tubs must feed into the ERP or a connected tool, with thresholds and alerts. A cold-chain break affecting a room must be cross-checked against the batches stored in that room over the period concerned.
On shelf life, three rules to verify during configuration: the use-by date is calculated from the date of catch, harvest or slaughter as appropriate, it is recalculated on freezing or thawing, and the “defrosted” statement must print automatically.
The batch recall test: require it before signing
A recall is the moment of truth. Ask the vendor or integrator to run the following exercise on your demonstration data:
- Pick a raw material batch (a trip, a farming batch, an imported batch with its catch certificate).
- Within minutes, obtain the list of all finished-product batches derived from it (splitting, pooling, processing).
- Obtain the list of customers delivered, with quantities and dates, and the stock still on site.
- Produce the customer notification document and the file for the authority.
A reasonable target is an answer within a few hours at most, with no manual reconstruction in a spreadsheet. If the demo goes through Excel exports, the product does not keep its promise. Regulation 178/2002 requires you to be able to identify suppliers and customers, and authorities expect a responsiveness that only an integrated system provides.
Sales: retail chains, wholesalers, export, volatile prices, invoicing by weight
- Invoicing on actual net weight. The invoice reflects the weight actually weighed at dispatch, not the quantity ordered. An order in pieces or kilos must convert without losing information.
- Volatile prices. Daily price lists by species and grade, customer prices indexed on the auction price or on the day’s purchase cost, minimum safety margins.
- Retail chains and logistics platforms. Strict specifications: logistics labelling (SSCC), dispatch advice (DESADV), EDI exchange, delivery windows, penalties. The food industry ERP comparison details these retail requirements.
- Traceability data passed to customers. Since 10 January 2026, Article 58 requires batch information to be made available digitally to the next operator. In practice: the delivery note or an electronic file must carry the batch number, species (FAO code and scientific name), area, gear or production unit, dates and net weight. Check with the vendor which exchange format is available (EDI, API, customer portal); minimum technical specifications are still to be defined by delegated acts.
- Export. Health certificates, customs documents, destination-country requirements. Scope these from the start if export is more than a marginal share of the business.
Accounting: biological assets (IAS 41 where applicable), margin by batch
For entities applying IFRS, IAS 41 Agriculture provides that biological assets (farmed fish, for example) and agricultural produce at the point of harvest are measured at fair value less costs to sell. If you report under local GAAP, or are a small entity outside IFRS, this rule does not apply: farming stock is valued at production cost. Confirm with your accountant and auditor.
In both cases, the ERP must meet three needs:
- Valuation of biological stock: direct costs (fry, feed, labour, energy) accumulated by batch, or fair value if IAS 41 applies, with a movement journal.
- Margin by batch: selling price minus purchase or farming cost, minus weight losses, minus packing and transport costs. It is the only margin that matters when the purchase price changes daily.
- Variance management: weighing losses, downgraded unsold goods, withdrawals, breakage. These variances must appear in the batch margin and not in a catch-all account.
Choosing a solution: food ERP, vertical, hybrid
Three families of solutions coexist. The table below compares their fit with the sector qualitatively: exact scope varies strongly from one vendor to another and must be verified in a demo on your own cases.
| Criterion | General food ERP | Vertical seafood ERP | Hybrid (ERP + specialist modules) |
|---|---|---|---|
| Catch weight, dual units | Often native, to verify | Native | Depends on the base ERP |
| Auction data, sales notes | Rarely | Often provided | Via a module or an interface |
| Farming cycle, biomass | Rarely | If the vendor covers aquaculture | Specialist module required |
| Batch traceability, recall | Good | Good, adapted to species and areas | Depends on interface quality |
| Scales and labellers integration | Standard | Standard, adapted to fish | Multiplies interfaces |
| Cost and lead time | Moderate | Variable, narrower installed base | Higher, more maintenance |
| Main risk | Functional gaps to fill with custom work | Dependence on a niche vendor | Integration and support complexity |
Recommendation. For a mid-sized wholesaler or processor, a solid food ERP complemented by auction data is generally the best compromise. For a fish farmer or shellfish grower, the farming layer (biomass, feed, mortality) makes the difference: a module or a vertical tool is probably needed. For a group combining farming, wholesale and processing, the hybrid approach is often unavoidable, with a single batch repository as the backbone.
In every case, apply the same criteria as in our other guides: a demo on your own cases, customer references in your sub-sector, and the batch recall test. For a parallel with another heavily traceable industry, see our guide on traceability and serialization in healthcare and pharma, and for collective upstream supply chains, the one on agricultural and cooperative ERP.
Implementation plan and pitfalls
A typical rollout runs in five stages.
- Regulatory scoping. Map batch flows, the mandatory Article 58 data, approvals and customer formats.
- Master data. Species (FAO code, scientific name), areas, gear, suppliers, production units, grades, presentations. Clean master data prevents most labelling errors.
- Integrations. Approved scales, labellers, temperature probes, auction data, customer EDI. Test in real conditions (humidity, cold, throughput).
- Acceptance testing. End-to-end scenarios: purchase, splitting, processing, dispatch, recall. The recall test is an acceptance criterion, not an option.
- Go-live and support. Train quay and workshop teams, who enter data as close to the physical action as possible. Plan extra support at start-up.
The most frequent pitfalls.
- Neglecting dual units: stock discrepancies appear within the first week.
- Re-keying auction data by hand: errors in trip numbers break the traceability chain.
- Trying to manage everything in the ERP, including tank monitoring: link, do not duplicate.
- Underestimating the workload of field teams: if data entry slows down the quay, it will be bypassed.
- Postponing compliance to 2028 or 2029: Article 58 already applies, and the upcoming delegated acts will specify formats, but the principle of the digital batch has been in force since January 2026.
Going further
To set your selection criteria, download our ERP evaluation grid: 30 criteria scored out of 100 to compare three vendors side by side, and add the seafood-specific requirements described above. To follow regulatory developments in the sector, subscribe to our newsletter. To scope a project in your company, contact us.