Publicité
ERP IMPLEMENTATION
🇫🇷 Lire en français →

ERP and Pillar Two (GloBE): The Data to Fix First and a 90-Day Readiness Plan

Pillar Two GloBE and your ERP: which data to fix, 5 common data gaps, 3 calculation architectures and a 90-day readiness plan for group finance teams.

ERP and Pillar Two (GloBE): The Data to Fix First and a 90-Day Readiness Plan

OECD Pillar Two is often presented as a job for tax specialists. In practice, it is won or lost in the information system: the GloBE Information Return (GIR) aggregates accounting, tax and payroll data, entity by entity and jurisdiction by jurisdiction. If your ERP does not supply that data cleanly, a spreadsheet will rebuild it, with the audit risk that implies.

This article is not a tax course. It focuses on data: what the rules require, where multi-entity ERPs fail most often, which architectures to choose and how to organise the next 90 days. For an overview of the rules and the modules involved, start with our guide to OECD Pillar Two and ERP.

Why Pillar Two Is an ERP Topic, Not Only a Tax One

Directive (EU) 2022/2523 of 14 December 2022 sets a minimum level of taxation for groups with annual revenue of at least €750 million in at least two of the four preceding fiscal years. It set 31 December 2023 as the transposition deadline and allows member states to apply a Qualified Domestic Top-up Tax (QDMTT).

Three reasons make this an ERP project:

  • The calculation starts from the accounts. The starting point is the accounting result of each constituent entity, adjusted. The chart of accounts, consolidation entries and adjustments live in the ERP or the consolidation tool.
  • The scope is a data scope. Knowing which entity belongs to which jurisdiction, and with what status (partnership, permanent establishment, transparent entity), is master data, not an opinion.
  • The return is standardised. The OECD defined a common return template, and a central filing arrangement allows the GIR to be filed in one designated jurisdiction. According to EY’s analysis of the OECD common understanding, calendar-year groups had to file their first GIR (fiscal year 2024) by 30 June 2026. Later years follow the ordinary deadline: confirm it with your tax authority.

The topic ties directly into what we described in our article on multi-site consolidation, intercompany and multi-currency: a group that consolidates its internal flows badly will also compute its minimum tax badly.

What the Rules Require in Terms of Data

Revenue and Profit by Jurisdiction

The calculation is done jurisdiction by jurisdiction, not entity by entity or at group level. For each entity you therefore need an accounting result, broken down and tied to its tax jurisdiction. Differences between local accounting standards and the consolidation standard must be documented, because the starting base is the consolidated one.

In the ERP, this means a reliable “tax jurisdiction” field on every entity, a history of changes in assignment, and the ability to extract balances by entity for the period.

Covered Taxes

The taxes taken into account are taxes on income, current and deferred, plus certain similar taxes. In the ledger you must therefore distinguish current tax expense, deferred taxes, withholding taxes and out-of-scope taxes. If everything is pooled in one “taxes and duties” account, the sorting will be manual.

Substance: Payroll and Tangible Assets

The rules provide a substance-based income exclusion, calculated from payroll costs and tangible assets in each jurisdiction. This data comes from payroll, HR and fixed-asset accounting, three areas often run on separate systems. Employees and assets must be mapped to the right jurisdiction, which is not always the case for seconded staff or leased assets.

Exact parameters (rates, thresholds, transitional periods) vary with national transposition. Refer to each country’s legislation and the competent tax authority before configuring anything.

The 5 Most Common Data Gaps in a Multi-Entity ERP

1. A Non-Harmonised Chart of Accounts

When each subsidiary keeps its local chart of accounts, the mapping to the group chart relies on manually maintained tables. A wrongly mapped account distorts the calculation base and nobody notices before the close. Fix: a single group chart of accounts, with versioned mappings validated by the tax function.

2. Deferred Taxes Calculated Outside the ERP

Deferred taxes are frequently calculated in a spreadsheet at consolidation level, then posted as an entry. GloBE calculations, however, work entity by entity. You need to be able to retrieve, for each entity, the detail of temporary differences. Fix: keep the detail by entity and by type of difference, not just the booked total.

3. Poorly Assigned Entities

An entity created or sold during the year, a partnership, a permanent establishment: all cases where the link to a jurisdiction is ambiguous or dates back several years. Fix: an entity register with jurisdiction, tax status, entry and exit dates, and a named owner.

4. Untraced Manual Adjustments

Period-end adjustments made in Excel files break the audit trail. At audit time, nobody knows why a given amount was corrected. Fix: post adjustments as entries in the ERP or consolidation tool, with supporting documents and an approver. We detail these requirements in our guide to the ERP audit trail.

5. Currencies and Translation Rates

Each entity has its own functional currency, the group has its consolidation currency, and the return has its own translation rules. If the ERP applies average rates to profit and closing rates to the balance sheet without documenting the method, translation differences become unexplained variances. Fix: a single, historised rate table and a written translation method.

Linking Pillar Two to Consolidation, Intercompany and the Audit Trail

The GloBE calculation rests on the consolidated accounts, but it requires a level of detail that classic consolidation does not always retain. Three links deserve particular attention.

Intercompany flows. Royalties, service recharges, internal loans and dividends feed the profit of some jurisdictions and reduce that of others. If intercompany eliminations are made at group level without keeping the detail by pair of entities, you will not be able to explain why a jurisdiction’s result moved. Require that every internal flow is identified by issuing entity, receiving entity and nature, and that reconciliation differences are resolved before the close.

From statutory accounts to consolidation. Every adjustment between local and group standards must be tied to an entity and a period. This chain, from the local entry to the line on the return, is the audit trail expected in case of an audit.

Data freeze. A return covers a closed fiscal year. You must be able to replay the calculation with the data as it stood on the filing date, even if the ERP has changed since. Plan for frozen, time-stamped extracts archived with the name of the person who validated them.

These three requirements are not specific to Pillar Two: they also serve the close, external auditors and other reporting obligations. That is why the programme should be funded as a finance data reliability project, not as a mere tax compliance exercise.

Three Possible Architectures

Calculation in the ERP or Consolidation Tool

The calculation is configured in the solution that already handles consolidation. Advantages: a single source of truth, a native audit trail, top-up entries posted directly. Costs: configuring and maintaining the rules at every regulatory change, dependence on the vendor’s roadmap. Audit risk: low if the rules are documented, high if the configuration is opaque.

Dedicated Tax Tool Fed by the ERP

A specialised tool receives ERP data through interfaces, calculates and generates the return. Advantages: regulatory updates handled by the tool vendor, simulation features. Costs: licence, interfaces, reconciliation between the tool and the ledger. Audit risk: it hides in the interface. If extracts are not frozen and time-stamped, you will not be able to replay the calculation.

Controlled Spreadsheet

A central workbook fed by ERP extracts. Advantages: low upfront cost, flexibility. Costs: recurring workload, dependence on one or two people. Audit risk: the highest. If you choose this option for a first year, enforce controls: version control, locked cells, second-person review, reconciliation with the ledger.

The right choice depends on the number of jurisdictions involved, the maturity of your consolidation and your time horizon. A group present in a few countries can start with a controlled spreadsheet, provided it plans the switch.

90-Day Readiness Plan

PeriodActionOwnerDeliverable
Days 1-15Map entities and their jurisdictionsTax departmentValidated entity register
Days 1-15Check the revenue threshold and the calendar of each relevant country against official sourcesTax departmentSourced scope note
Days 15-45Audit chart of accounts and group mappingsCFO and consolidationVersioned mapping table
Days 15-45Identify current and deferred taxes by entityTax and accountingExtract by type of tax
Days 30-60Map payroll and fixed assets to jurisdictionsHR, finance ITPayroll and tangible asset extracts
Days 45-75Choose the calculation architectureCFO, finance ITDocumented decision, budget
Days 60-90Run a simulation on a closed fiscal yearTax, consolidationTest set and list of variances
Days 75-90Formalise the audit trail and controlsInternal controlProcedure and control matrix

Questions to Ask Your ERP or Consolidation Vendor

  • Does the solution handle GloBE rules natively, or is a module or partner required?
  • How are rules updated when a national transposition changes, and at what cost?
  • Can the data used for a calculation be frozen and time-stamped, so the calculation can be replayed identically?
  • Is the output format compatible with the OECD return template and your country’s filing procedures?
  • How are dated entity assignments, transparent entities and permanent establishments handled?
  • How are permissions managed: who can change a mapping or an adjustment, and with what trace?

Insist on written answers and a demonstration on your own data, not on a demo dataset.

Mistakes to Avoid

  • Treating the topic at year-end. Data gaps are fixed before the close, not during it.
  • Assuming the calendar is the same everywhere. Each country has its own transposition and options (QDMTT, deadlines). Check country by country.
  • Leaving the project to the tax department alone. Without finance IT, consolidation and HR, the data will not follow.
  • Leaving adjustments in untraced files. It is the first point of attack in an audit.
  • Choosing the tool before mapping the data. A tool does not compensate for a wrong entity register.
  • Forgetting other reporting obligations. Pillar Two adds to other data projects, such as those described in our article on DAC7 and platform reporting obligations.

Going Further

For groups with a large network of entities, our article on consolidation and reporting for franchise networks details the points to watch on scope. If you would like a Pillar Two data-readiness audit of your ERP, get in touch. To follow our upcoming regulatory guides, subscribe to the blog newsletter.