Katana vs MRPeasy vs Odoo MRP: Which ERP for a Small Manufacturer in 2026?

Katana, MRPeasy or Odoo MRP for a small manufacturer? 8 weighted criteria, 3-year cost, compliance gaps and a 30-day rollout plan.

Katana vs MRPeasy vs Odoo MRP: Which ERP for a Small Manufacturer in 2026?

About ten employees, one workshop, a Shopify store or a handful of large B2B customers. Your bills of materials live in Excel, your stock levels live in the heads of two people, and the day a component runs out, production stops. A full ERP such as SAP or Dynamics 365 is out of proportion. A simple inventory app is no longer enough.

Between the two, three names keep coming up in searches: Katana, MRPeasy and Odoo MRP. This comparison puts them side by side on eight weighted criteria, estimates the cost over three years from the public price lists as of 28 November 2026, and says plainly where each one falls short, especially on European and French compliance.

Who this comparison is for (and when to move to a heavier ERP)

This guide is aimed at three kinds of business:

  • e-commerce makers (cosmetics, food, textiles, accessories) who assemble or produce small batches and sell online;
  • make-to-order workshops (carpentry, mechanical, electronics) that need to quote, schedule and track manufacturing orders;
  • small manufacturers of 20 to 50 people who are starting to have multi-level bills of materials and a need for traceability.

If you have several production sites with heavy inter-site flows, pharmaceutical-grade regulatory constraints or multi-entity accounting, read our comparison Odoo 19 vs Dynamics 365 Business Central for industrial SMEs instead. If your question is broader (sales, accounting, HR, not just production), read Zoho One vs Odoo 18 vs Sage 50.

Method: 8 weighted criteria

Each tool is scored on eight criteria. The weighting reflects a typical small manufacturer; adapt it to your own case.

CriterionWeightWhy
Multi-level bills of materials (BOM)20%Core of the job: without a reliable BOM, everything else is wrong
Capacity planning15%Knowing whether Friday’s order is feasible
Inventory and lots15%Traceability, stock-outs, valuation
Shopify / WooCommerce integration10%Vital for the e-commerce maker
Accounting10%Built in or to be connected
Multi-site5%Rarely useful at 10 people, decisive at 40
Price15%Subscription and setup cost
EU/FR localization and e-invoicing10%French legal obligations

This grid is an editorial starting point, not a standard. Our ERP selection grid offers a 30-criteria version you can score yourself.

Product profiles

Katana

Katana is cloud software designed from the start for manufacturers who sell online. Its interface puts the “stock, sales orders, manufacturing orders” view on a single screen.

What it does well. Its official pricing page states that the free plan includes unlimited users, integrations and stock locations, with a limit of 30 SKUs (Katana, pricing page viewed 28 November 2026). The Shopify integration is native and syncs orders and stock in real time, with connectors for WooCommerce, Amazon, QuickBooks Online and Xero (Katana, integrations). For an e-commerce craftsperson, getting started is fast.

Where it stops. The advertised accounting connectors are those of the Anglo-Saxon world (QuickBooks, Xero). Katana does not replace an accounting system: it sends financial data to third-party software. None of the sources we consulted indicates native compliance with French e-invoicing or the FEC (the French accounting entries file): that is for your accounting software to handle, not Katana. On planning, it is a simple scheduling tool, not a fine-grained capacity engine per work center.

Price: a point of caution. The official page, viewed on the date above, shows a free plan and an “Advantage” plan on quote, with an annual contract. Price aggregators show a moving grid: one third-party tracker reports a move from “$0 to $1,799 per month” in March 2026 to “$0 to $299 per month” in July 2026 (CostBench, Katana history). We therefore use, as an estimate, an entry ticket of about $299 per month for usage beyond the free plan, to be confirmed by quote.

MRPeasy

MRPeasy is a general-purpose cloud MRP for small producers, with CRM, purchasing, inventory, production and standard accounting in the same subscription.

What it does well. All plans include production planning with drag-and-drop rescheduling, bill of materials management, lot traceability, warehouse management, workforce planning, multi-language and multi-currency. The listed integrations cover BigCommerce, Magento, Shopify, WooCommerce, QuickBooks Online, Xero and Zapier. Subcontracting, quality control and the product configurator start with the Professional plan; multi-site production, maintenance and barcodes start with Enterprise (MRPeasy, pricing viewed 28 November 2026).

Where it stops. Pricing is per user, which gets expensive as soon as the shop floor has many connected operators. Accounting is described as “standard”: for a French company, it does not replace software that complies with the French chart of accounts. On the pricing page we found no mention of French e-invoicing or the FEC.

Price. Starter $49, Professional $69, Enterprise $99, Unlimited $149 (the latter from 2 users), per user per month, with one month free on annual billing (same source, viewed 28 November 2026).

Best for. MRPeasy suits a small producer with a handful of office users who wants planning, purchasing, lot traceability and light accounting in one subscription, without going through an integrator. It is a poor fit if many shop-floor operators need their own seat, since per-user pricing climbs quickly. It is also the wrong choice if you need an accounting system compliant with the French chart of accounts, French e-invoicing or the FEC: you would then pair it with dedicated software or look at Odoo.

Odoo MRP (Community vs Enterprise)

Odoo is the only one of the three that also covers accounting, sales, purchasing and the e-commerce site in a single modular product.

Community. Open-source edition, hosted by you or by a service provider. According to integrator comparisons, it offers bills of materials, manufacturing orders, subcontracting and repair orders, while tablet work orders, work-center scheduling, the master production schedule (MPS), barcodes, quality and maintenance belong to Enterprise (Cybrosys, Odoo 18 Community vs Enterprise in manufacturing). Scopes change from one version to the next: have the exact list checked for the version you target.

Enterprise / Odoo Online. For manufacturing, Odoo highlights multi-level bills of materials, capacity planning by work center through the MRP planner, Gantt and Kanban views, quality checks and traceability (Odoo, manufacturing features).

Where it stops. The power comes at the price of complexity: configuring manufacturing, valued inventory and accounting takes a serious integrator. On French compliance, the Odoo ecosystem offers modules and partners, but e-invoicing depends on the partner you choose and the certified platform you retain; ask for a demonstration on your own case, not a sales promise.

Price. Standard plan at €19.90 and Custom plan at €35.90 per user per month on annual billing (€24.90 and €44.90 monthly). A “one free app, unlimited users” plan exists (Odoo, pricing viewed 28 November 2026).

Side-by-side table and recommendation by profile

Criterion (weight)KatanaMRPeasyOdoo MRP
Multi-level BOM (20%)GoodGoodVery good
Capacity (15%)BasicGood (visual rescheduling)Very good (Enterprise)
Inventory and lots (15%)GoodVery good (lots from Starter)Very good
Shopify / WooCommerce (10%)Very good (native Shopify)GoodFair to good, depending on module
Accounting (10%)ExternalStandard, built inComplete
Multi-site (5%)Unlimited locationsFrom EnterpriseYes
Price (15%)Estimate: high when payingMedium, per userLow, but budget for an integrator
EU/FR localization (10%)To verify, undocumentedTo verify, undocumentedPossible via partners

The qualitative ratings are our reading of the published features, not a lab test.

Profile 1, e-commerce craftsperson (1 to 10 people, Shopify). Katana, because the Shopify order, stock and manufacturing loop is its reason for existing. Start with the free plan to validate the flow on your first 30 products, then price the upgrade. Keep your local accounting software alongside it.

Profile 2, make-to-order workshop (10 to 25 people). MRPeasy, for visual rescheduling, subcontracting and lot tracking without a heavy integration project. Check the plan: subcontracting requires Professional.

Profile 3, small manufacturer (25 to 50 people, accounting to unify). Odoo MRP in Enterprise with an integrator, because it avoids stacking software and handles capacity, quality and accounting in a single database. If an integrator budget is out of reach, Community remains an option, provided you accept its planning limits.

Real cost over 3 years

Public price lists as of 28 November 2026. Assumptions: 5 users, annual billing, excluding tax, prices in their original currency, no price changes. The amounts below are calculations from public prices; the integrator and migration lines are estimates to validate by quote.

ItemKatanaMRPeasy StarterMRPeasy ProfessionalOdoo StandardOdoo Custom
Public priceapprox. $299/month (estimate)$49/user/month$69/user/month€19.90/user/month€35.90/user/month
1-year subscriptionapprox. $3,588$2,695 (11 months billed)$3,795 (11 months billed)€1,194€2,154
3-year subscriptionapprox. $10,764$8,085$11,385€3,582€6,462

The MRPeasy calculation follows the “one month free” annual mention: 5 users, 11 months billed per year. For Odoo, the per-user price does not cover integration.

To add, whichever solution you choose:

  • Integrator or configuration: a few days for Katana and MRPeasy if your bills of materials are clean, several weeks for Odoo. Negotiate a fixed-price package.
  • Data migration: items, bills of materials, suppliers, opening stock. This is often where the schedule slips.
  • Accounting connector and e-invoicing: compliant accounting software is still required for Katana and MRPeasy.
  • Future migration: plan the data export from the day you sign.

The trap of price comparison is to look only at the subscription: the real gap comes from integration, data quality and internal time spent. For the full-cost logic on the Odoo side, our guide to real Odoo pricing details the cost items.

Common limits and signs it is time to switch tools

Common limits.

  • Compliance to verify, not assume. Mandatory e-invoicing and the FEC depend on your invoicing and accounting software. For these three tools, we found no official documentation guaranteeing native French compliance: ask in writing before you sign.
  • Limited finite scheduling. None replaces an advanced planning and scheduling (APS) system for complex routings with multiple bottlenecks.
  • Complex variants. If you sell in sizes and colors with different bills of materials, read our guide on variant matrices, BOM and stock before choosing.
  • Data quality. No tool fixes a wrong bill of materials.

Signs you need to switch tools.

  1. You work around the tool with Excel files to plan.
  2. A second production site appears with frequent transfers.
  3. A customer or auditor demands traceability or documented quality that the tool cannot produce.
  4. Cost per user grows faster than the value delivered.
  5. You maintain more than three fragile connectors between tools.

30-day rollout plan

Week 1: scoping. List your 20 best-selling products, their bills of materials, your work centers and your Shopify or WooCommerce flows. Name an internal owner. Set three indicators: stock-outs, on-time delivery, data entry time.

Week 2: data. Clean up items, units and bills of materials. Build an import file for each solution under test. Send your compliance questions to each vendor in writing.

Week 3: pilot. Test in parallel (trial version or free plan) on a single product end to end: order, purchase, manufacturing, shipping. Measure the real time spent.

Week 4: decision. Score each solution with the weighted grid, compare the three-year cost with quotes in hand, then decide. Only switch all production after a month of consistency between physical stock and software stock.

Going further

Score Katana, MRPeasy and Odoo with your own weighting by downloading our ERP selection grid: 30 criteria to compare three vendors side by side. To widen the discussion, read the Zoho One, Odoo 18 and Sage 50 comparison.