Your ERP invoices a customer in Austin, Texas the same way it invoices one in Lyon: a net price, VAT calculated by country, one accounting entry. Except the United States has no VAT. It has sales tax, governed by different rules in every state and sometimes in every municipality. For a European exporter, the discovery rarely comes in advance. It arrives as a letter from a state department of revenue noting that you should have been collecting the tax for several quarters.
This article is for finance leaders at European mid-market companies selling into the US (e-commerce, SaaS, industrial) who must choose between three specialist vendors, Avalara, Vertex and Sovos, or the native tax capabilities of their ERP. For European VAT and global indirect taxes, see our guide to indirect tax automation. Here we cover US sales tax only, state by state.
Why US Sales Tax Is Not VAT
Carrying VAT logic over to the US is the first trap. The structural differences:
- No federal tax. Each state, and in many cases each county, city or special district, sets its own rules and rates. The applicable rate depends on the exact delivery address, not just the state.
- Single-stage and non-recoverable. VAT is neutral for the taxable person thanks to input deduction. Sales tax is collected on the final sale, and purchases for resale or production are normally exempted through a certificate. The mechanism therefore relies on exemption certificates that you must collect and retain, where Europe relies on deduction.
- Variable tax base. The same product can be taxable in one state and exempt in another. Services and online software (SaaS, downloads) are treated very differently from state to state: taxable here, out of scope there.
- Destination-based sourcing in most cases, though a few states apply origin-based or hybrid rules. Check the regime of every state where you have an obligation.
- Filings specific to each tax authority, with different frequencies and separate portals.
The consequence for your systems: a rate per country is no longer enough. You need resolution by address, by product category and by customer status.
Physical and Economic Nexus: When the Obligation Starts
Nexus is the sufficient connection between a seller and a state for that state to require tax collection. For a long time this meant physical presence: an office, a warehouse, an employee, inventory.
That changed with the Supreme Court’s decision in South Dakota v. Wayfair, of June 21, 2018, which removed the physical presence requirement and allowed states to require collection based on economic nexus: a significant sales volume or number of transactions in the state. Each state has since set its own criteria.
What a European CFO should take away:
- Thresholds vary by state and are revised. We deliberately do not quote them here: check the department of revenue website of each state concerned, the only authoritative source, and have your US tax advisor validate them.
- Physical nexus is still a trigger: inventory at a US logistics provider (FBA, for example), a subsidiary, a travelling salesperson, trade show attendance.
- Nexus is assessed state by state. A company can have an obligation in a handful of states and none in the rest.
- The exposure is retroactive. Until you are registered, the uncovered period stays at risk: a state can claim the tax that should have been collected, with penalties and interest, even though you never charged it to the customer. The company often bears the cost. Several states offer voluntary disclosure programs, which you should review with an advisor before taking any step.
One separate point: the marketplace facilitator. When you sell through a marketplace (Amazon, Etsy and so on), most states place collection and remittance on the platform for the sales it facilitates. That does not release you from everything: your direct sales (own website, B2B) remain your responsibility, and registration and exemption rules are not uniform. Map your channels before concluding that you are covered.
What a Tax Engine Does: Calculation, Compliance, Filing
The market blends three functions that should be separated in your requirements.
- Calculation. At order or invoice time, the engine receives the address, product code and customer status, and returns the tax by jurisdiction. This is a real-time function called by the ERP or the online store.
- Compliance. Monitoring nexus thresholds, managing exemption certificates (collection, validation, expiry date, link to the customer), and keeping rates and tax-base rules up to date.
- Filing. Registering with the states, preparing and submitting periodic returns, remitting the tax. Often sold as a service separate from the calculation subscription.
Many projects fail because the company buys calculation believing it bought compliance. An engine that calculates perfectly files no return and registers you in no state.
Comparison: Avalara, Vertex, Sovos, Native ERP Tax
Prices are given qualitatively: they depend on transaction volume, number of states and modules, and are negotiable. The elements below reflect the general positioning of each offering and should be validated with each vendor during the selection process.
| Criterion | Avalara | Vertex | Sovos | Native ERP tax |
|---|---|---|---|---|
| US sales tax coverage | Very broad, offering centered on this market | Very broad, long-standing enterprise footprint | Broad, more oriented to multi-country compliance | Rate tables to maintain, partial coverage |
| ERP connectors | Extensive catalog (SAP, D365, NetSuite, Odoo and e-commerce platforms) | Strong on SAP and Oracle, connectors for D365 and NetSuite | Connectors for the major ERPs, project-led integration | Native, but limited to what the ERP vendor ships |
| Filing included | Yes, as a dedicated service | Yes, via compliance services | Yes, depending on the offer | No, or manual entry |
| Exemption certificates | Dedicated module | Dedicated module | Depends on the offer | Rarely, often a free-text field |
| Target audience | SMB to mid-market, e-commerce, SaaS | Mid-market and large groups, complex environments | Mid-market and multi-country groups (VAT, e-invoicing, US) | Low volume, few states |
| Price (qualitative) | Medium to high, grows with volume | High, heavier integration project | Medium to high, valuable if you consolidate several regimes | Low license cost, hidden cost in maintenance and risk |
Quick read:
- Avalara is the default choice for high transaction volumes and multiple channels, thanks to its connector breadth and filing offer.
- Vertex suits complex ERP environments where indirect tax is centralized and tax teams carry real weight.
- Sovos makes sense if you want a single provider for several regimes (US sales tax, VAT, e-invoicing). For the e-invoicing side, see our comparison of SAP DRC, Sovos and Pagero.
- Native tax is defensible only if your exposure is limited: few states, uniformly taxable products, low volume. Beyond that, rate tables become a permanent maintenance burden.
SAP, D365, NetSuite, Odoo Integration: Calculation Latency and Product Code Mapping
The two technical issues that derail projects:
Calculation latency. The engine is called by API for every order, quote or invoice line. In SAP and Dynamics 365, the call goes through a connector or a tax extension module; in NetSuite, through a SuiteApp; in Odoo, through a community module or a custom-built connector. Test response time on a basket of several dozen lines, with a defined fallback if the service is unavailable (default rate, queueing, blocking validation). This choice is a business trade-off, not just a technical one.
Product code mapping. The engine does not know your item numbers. Each item must be linked to a taxability code (a tax category recognized by the vendor). With thousands of SKUs, this is done through rules on item families, with human review of the exceptions: spare parts, hardware and software bundles, subscriptions with a service component, shipping. Approximate mapping produces too much or too little tax, with no visible error in the ERP.
Other integration points: currency handling (your ERP may invoice in euros while tax is computed in dollars; see our guide to multi-currency management and exchange rates), posting tax amounts to the right sales tax payable accounts, and reconciling calculated tax with filed tax.
Recommendations by Profile
B2C e-commerce. High volume, many states, mixed channels (own site and marketplaces). Favor an engine with native store connectors and filing included. First map what the marketplaces collect on your behalf. Avalara is usually the first candidate to test.
SaaS and digital services. The main issue is the taxability of software, which varies sharply by state, and customer location (billing address, not just IP). The engine must handle dedicated SaaS and services categories. Avalara and Vertex are the references; Sovos if you already handle your European obligations with them.
B2B manufacturing. Many sales are exempt for resale or manufacturing, so exemption certificates must be managed at scale. The deciding criterion is not calculation but document management. Vertex works well in SAP environments; Avalara if you have fewer integration constraints.
Low exposure. A few states, small volume: the ERP’s native tax, supplemented by an external filing provider, may be enough for a while. Reassess each time you cross into a new state.
Ten Questions to Ask Vendors Before Signing
A brochure comparison does not replace a test on your own data. During demos, demand precise answers on the following:
- Does the contract cover calculation only, or also state registration and return filing? Who is liable if a rate is wrong?
- How does the engine detect that a nexus threshold is being approached, and how often is sales data refreshed?
- Is the connector for your ERP version maintained by the engine vendor, the ERP vendor or an integrator? Who fixes it after a version upgrade?
- How does the connector behave if the engine’s API does not respond?
- How are credit memos, partial returns and order changes after invoicing handled?
- Can exemption certificates be collected directly from the customer, and does the engine link them automatically to the right transactions?
- Which taxability categories exist for SaaS, services and bundles?
- Are calculation logs retained and exportable in case of an audit?
- How does pricing change as volume or the number of states grows?
- What are the exit terms: export of data, certificates and filing history?
These questions often reveal more than the feature list: a vendor that answers clearly on liability and exit is generally safer than one promising total coverage.
Who Owns the Topic Internally
Sales tax rarely falls within the natural scope of a single department. Tax sees it as a compliance matter, IT as one more connector, sales as friction at checkout. Appoint a single owner, often within finance, who arbitrates taxability rules, validates the product code mapping and receives nexus alerts. Schedule a quarterly review of the states where you are registered, certificates nearing expiry, and gaps between calculated and filed tax. Without this ownership, even the best engine degrades within a few quarters, as new products, new channels and rule changes in each state accumulate.
A 60-Day Implementation Plan
- Days 1 to 15: diagnosis. Rebuild your sales by state over the open period, by channel. With your US advisor, identify the states where nexus exists or is approaching. Collect existing exemption certificates.
- Days 15 to 30: selection. Write requirements that separate calculation, compliance and filing. Run demos with your own data, and test edge cases (multi-address shipping, bundles, credit memos).
- Days 30 to 45: integration. ERP connector, product code mapping, general ledger accounts, degraded-mode handling for outages. Registration in the selected states.
- Days 45 to 60: controlled cutover. Run in parallel on a pilot scope, reconcile calculation and filing, train billing and customer service, then roll out.
Pitfalls to Avoid
- Approximate product codes: the most frequent source of discrepancies, invisible until an audit exposes them.
- Expired or incomplete certificates: an exemption without a valid certificate will not survive a state audit. Track expiry dates and automate reminders.
- Calculation without filing: you collect the tax, but nobody remits it.
- Assuming the marketplace covers you: only sales made through the platform are covered.
- Ignoring the past: registering today does not settle the earlier period. Treat remediation as a topic in its own right, with an advisor.
- State audits: keep invoices, certificates, delivery addresses and calculation logs, and check that your engine lets you retrieve them.
Going Further
A review of the tax chain (address, product code, calculation, posting, filing) avoids most of these pitfalls before go-live. If you would like an outside view on your architecture, contact DigitsLane.
To go deeper, also read our guide to indirect taxes and tax engines and our analysis of SAP DRC, Sovos and Pagero.