An HVAC, plumbing and heating contractor with 10 to 100 employees rarely lives off a single line of work. On Monday morning, one crew fits a heat pump on a retrofit job. At the same time, a technician is fixing a broken boiler for a customer under contract, another is doing the annual service on five installations, and the trade counter is calling about a part nobody can find. All of it runs through the same schedule, the same vans, the same cash flow and, far too often, tools that do not talk to each other: a quoting package, a contract spreadsheet, paper job sheets and a shared calendar.
This article is for owners, finance directors and service managers of heating engineers, plumbers and refrigeration and air-conditioning contractors. It sets out a requirements list for an HVAC and plumbing ERP built around what makes this trade different: recurring service work and mobile stock. For energy retrofit and solar, see our guide to ERP for solar PV and energy renovation installers. For project-based job costing, see the construction ERP guide.
Two Economies Under One Roof: New Installs and Recurring Service
The first instinct is to search for “HVAC management software”. In reality a company in this sector runs two business models that follow different rules.
The project economy. It works job by job: a quote, a fixed selling price, purchases, hours, progress, deposits or stage invoices, handover. The main risk is the gap between the estimate and the real cost. Control happens at the end, through the margin on the job.
The service and maintenance economy. It works by installed base and by flow: hundreds or thousands of small call-outs, scheduled visits, unplanned breakdowns, contracts invoiced every year. The main risk is repeated inefficiency: a wasted trip, a missing part, a badly built route. Control is continuous, call-out after call-out.
For an owner, the strategic point is that the second economy cushions the swings of the first. An installed base under contract brings visibility, steady cash and chances to sell replacements. But that recurrence is only manageable if the ERP can link three objects: the equipment installed at the customer’s site (make, model, serial number, commissioning date), the contract that covers it, and the history of interventions. This is the most discriminating selection criterion, well ahead of how pretty the quoting screen is.
A simple demo test: “Show me everything that has happened on Mr Durand’s boiler since it was installed, and tell me whether it is still under contract.” If the answer takes three screens and an Excel export, the tool handles projects but not the installed base.
Key Processes
Quotes and a Supplier Item Library
A plumbing or heating quote is largely an assembly of part references: boilers, valves, circulators, fittings, ducting, outdoor units. Quote speed and reliability therefore depend on the item library.
What to require:
- Import of merchant price lists (prices, descriptions, references, pack sizes) without re-keying, with periodic updates of purchase prices. Most distributors supply price files; check in the demo that your main merchant is supported, and at what set-up cost.
- Assembled items: “replace condensing gas boiler” or “install a wall-mounted split” bundling equipment, labour, small materials and travel, with standard times.
- Selling coefficients and margin visible at quote time, by line and in total.
- Price revision between quote and order: on equipment whose list price moves, a quote valid for three months with no purchase margin check is a real risk.
- Converting the quote into an order, a purchase and a job without re-keying.
Breakdown or replacement quotes at the customer’s home are sometimes done on the spot, on a tablet, with an immediate signature. This very common case means the item library must be available offline, or synchronise reliably.
Technician Scheduling, Dispatch and Emergencies
Scheduling is the operational heart. It has to combine very different kinds of work: maintenance visits planned long in advance, multi-day projects, and emergencies (a leak, a heating failure in winter, air conditioning down in summer).
A suitable ERP can:
- Assign by skill: one technician is certified for gas, another for refrigerants, a third for heat pumps. A job must not be assignable to someone without the required qualification.
- Account for geography: group jobs by area, show the map, estimate travel time.
- Handle emergency insertion: see within seconds who is closest, with which parts in the van, and what the insertion pushes back.
- Distinguish planned from actual duration, to refine standard times by job type over time.
- Notify the customer (SMS or email with a time slot) and cut no-shows.
A methodological tip: before choosing, measure over one month the number of emergencies, the share of planned visits and the number of reschedules. A dispatcher who spends two hours every morning reshuffling routes is a hidden cost the ERP must reduce, and that gain belongs in your decision file.
Mobile App: Job Sheet, Signature, Photos
In practice the technician’s mobile app decides whether the project succeeds. If it is clumsy, technicians go back to paper, and the ERP data will be wrong.
Minimum features:
- Viewing the job, the equipment history and site access notes.
- Digital job sheet: work done, time spent, parts used, comments.
- Customer signature on screen, and the sheet emailed to the customer.
- Timestamped photos before and after, useful in a dispute or warranty claim.
- Readings and measurements for servicing: for example combustion or carbon monoxide values, captured in structured fields rather than free text.
- Offline mode: basements, cellars, dead zones. Data must sync when the network returns, with no duplicates or losses.
- On-site payment or payment request where the trade allows it.
The point to watch is same-day invoicing: a sheet signed on Tuesday should feed the invoice on Tuesday evening, not on Friday after re-keying at the office. The delay between job and invoice is one of the easiest cash levers to pull.
Van Stock and Replenishment
Van stock is the most underestimated topic. Each van is a small warehouse: dozens of references, sometimes expensive, often critical (a circuit board, a circulator, a thermocouple, a three-way valve). Without control, two scenarios are costly: the technician without the part who has to come back, or the van carrying parts that have sat idle for months.
The ERP must treat each van as a full stock location, with:
- A target stock per van (for example by technician profile: boilers, air conditioning, general plumbing), and automatic replenishment calculated as the difference from actual stock.
- Movements tied to the job: the fitted part leaves the van and is charged to the customer and the job, with no separate entry.
- Cycle counts that are simple on mobile (barcode or QR scan), rather than a heavy annual stocktake.
- Transfers between depot, van and supplier, with returns of faulty parts under manufacturer warranty. The process is described in our guide to ERP and warranty management for after-sales.
- Batch replenishment: in the evening or the morning before the round, the list of what must be reloaded, or a merchant order with click-and-collect.
- Traceability for tracked items: serial numbers of installed appliances, refrigerant batches depending on your activity.
A simple indicator to follow: the share of jobs completed without a return visit for a missing part. It is close to the first-time fix rate, covered below.
Maintenance Contracts and Recurring Billing
A boiler, heat pump or air-conditioning maintenance contract is a management object in its own right. It must include:
- the scope (covered equipment, address, equipment type);
- the nature of cover: annual visit only, with or without breakdown labour, with or without parts;
- the frequency and automatic generation of visits in the schedule, with the right date window;
- recurring billing: due date, any indexation, direct debit;
- the term, renewal and grounds for termination;
- tracking of renewals and contracts nearing expiry.
Indexation deserves attention: if your contract provides for an annual price review, the ERP must apply it with a history, without manual rework of hundreds of lines.
A contract is also a sales lever: ageing equipment with repeated breakdowns is a natural replacement candidate. A well-designed ERP surfaces these signals (number of call-outs in a year, equipment age) to the sales team, who can offer a replacement quote at the right moment.
On the billing side, think about B2B e-invoicing: a company that invoices property managers, landlords, shops or public bodies must prepare. See our review of the first month of e-invoicing in France.
Tracking Servicing Obligations, Certificates and Qualifications (Points to Watch)
Without turning this into a regulations course, several points end up in the ERP.
Annual servicing and certificate. According to the French government’s public service site, annual servicing applies in particular to oil, gas, wood, coal or multi-fuel boilers from 4 to 400 kW, as well as heat pumps, and the technician must hand over a servicing certificate within 15 days (service-public.gouv.fr, boiler servicing). That page addresses tenants, but it describes the obligation your customers are subject to. For you, the consequence is a certificate issue deadline to track, and a document to attach to the equipment record. Other countries have their own regimes (gas safety records, refrigerant handling rules under the EU F-gas framework and national equivalents): the principle is the same.
Technician qualifications. Depending on your activity, certifications or approvals condition certain jobs (refrigerants, gas, electrical, qualifications that give access to grants). The ERP must store, for each technician, the title, the date obtained and the expiry date, with an alert before expiry, and ideally block assignment when a qualification has lapsed.
Evidence. Photos, readings, signed sheets and certificates are your defence in a dispute or accident. They must be retrievable by customer, equipment and date, not buried in a mailbox.
The exact requirements depend on your scope and change over time: validate them with your trade bodies and the official texts, and translate them into mandatory fields and controls in the ERP.
Profitability: Cost per Call-Out, First-Time Fix, Margin on Parts
An ERP is justified by indicators, not features. Three measures dominate this trade. As we have no reliable public sector benchmark to cite, we give no target values: calculate your own on twelve months of history before the project.
Cost per call-out. It is made up of technician time (productive and non-productive), travel, the vehicle, parts used and a share of overhead (planning, invoicing, reception). Many owners know the price they charge; few know the full cost. The ERP must let you calculate a loaded hourly cost per technician and a utilisation rate (billed hours over paid hours), then obtain margin by job type.
First-time fix rate. This is the share of jobs resolved on the first visit. Every return for a missing part, wrong diagnosis or absent equipment doubles the cost of the job and damages the customer relationship. Two causes dominate: van stock, and the quality of the information given to the technician before leaving (equipment history, described symptom, customer photos). To measure it, you need a standard closing reason (“resolved”, “return for part”, “return for diagnosis”) enforced in the mobile app.
Margin on parts. Spare parts often carry a higher margin than labour, but it is easily lost: purchase prices that move without the selling price being updated, parts fitted but not invoiced, forgotten consumables. Reconciling stock issues with invoiced lines is the most profitable control. The gap (parts consumed but not invoiced) is sometimes the first visible gain of the project.
To structure these indicators in a dashboard, see the guide to reporting and BI in the ERP.
Renovation Grants (MaPrimeRénov’, CEE): Impact on Invoicing and Files
When the company replaces a heat generator or installs a heat pump for a homeowner, grants enter the file. This article does not detail the scales, which change regularly: refer to official sources at the date of your project. The two schemes below are French; the same design questions arise wherever energy-efficiency subsidies or supplier obligations exist, such as ECO schemes or heat pump grants in other countries.
What matters for the ERP:
- MaPrimeRénov’. The scheme is run by Anah, and the government page on the role of the agent (mandataire) notes that some operators can assist the homeowner or receive the grant on their behalf (service public entreprises, MaPrimeRénov’ agent). If you act as an agent or work with one, the ERP must separate what the customer owes, what the grant will pay and what passes through a third party.
- CEE (energy savings certificates). The Ministry of Ecological Transition describes a scheme based on standardised operations, with flat-rate amounts in kWh cumac, and a role for professionals in carrying out the works (official ministry page). For the ERP, this means attaching each operation to the right file, keeping proof of the works and identifying any bonus deducted from the quote.
- Invoicing. The customer’s remaining balance, the bonus deducted or advanced, and the mentions required on quotes and invoices must be configured. An inaccurate invoice can block payment of a grant.
- File. Signed quote, sworn statement, invoice, photos and proof of qualification must be viewable by file. The audit trail is covered in our article on ERP audit trail and retention obligations.
With these files, the gap between purchases paid to the merchant and receipt of the grant weighs on cash. Our article on energy renovation installers details this working-capital mechanism.
Choosing: Construction ERP, Trade-Specific Software or Odoo Field Service
Three families of solutions are on offer, with different strengths.
| Criterion | Construction ERP / job management | HVAC / service trade software | Odoo (Field Service, Inventory, Subscriptions) |
|---|---|---|---|
| Quotes and merchant library | Good, notably for assembled items | Very good, catalogues pre-integrated depending on vendor | To configure, price import to plan |
| Job tracking and stage invoicing | Very good | Variable | Fair, depending on modules and adaptation |
| Scheduling and dispatch | Average, project-oriented | Good to very good | Good, with map and planning |
| Technician mobile app | Variable | Often native and simple | Available, to validate in real conditions |
| Equipment base and contracts | Often limited | Strong point | Possible, with configuration |
| Van stock | Variable | Often present | Native (multi-location) |
| Flexibility and integration | Average | More limited | Strong, but integration cost |
| Main risk | Under-serves service work | Dependence on a niche vendor | Scope creep if poorly framed |
Real capabilities vary by vendor and version: this grid is a starting point for your requirements, not a verdict. Ask each candidate to run your scenario (quote, scheduling, emergency, signed sheet, invoice, renewed contract) on your data.
Recommendation by size (to adjust for your situation).
- 10 to 25 employees, mostly breakdown and servicing work: trade-specific HVAC software is generally the fastest to implement. Priority goes to the simplicity of the mobile app.
- 25 to 60 employees, mix of projects and service: the choice is between robust trade software and a modular ERP platform. The installed-base and van-stock tests decide it.
- 60 to 100 employees, several branches, centralised purchasing: an ERP platform such as Odoo or equivalent becomes relevant, with an integrator who knows the trade and solid project governance.
To decide what to adapt and what to take as standard, hold gap workshops before signing. Our guide on fit-gap workshops, standard vs custom gives the method.
A 90-Day Rollout, 5 Mistakes and Countermeasures
A phased rollout reduces risk without stopping the business. This calendar is a starting point, to adjust for your size and data quality.
Days 1 to 30: scope and prepare.
- Map the processes (quote, dispatch, job, invoicing, contracts).
- Clean the customer, equipment and contract files: this is the longest task.
- Define baseline indicators (first-time fix rate, utilisation, margin on parts) to measure the gain.
- Choose lead technicians for the mobile app.
Days 31 to 60: configure and pilot.
- Set up the item library, assembled items, van stocks and contract templates.
- Import the equipment base and active contracts.
- Run a pilot with a team of 3 to 5 technicians, with digital job sheets and photos.
Days 61 to 90: roll out and secure.
- Extend to all technicians, in waves.
- Switch over recurring billing after checking the first batches.
- Review the indicators and fix the closing reasons.
- Train the office on exceptions (emergencies, credit notes, amended contracts).
The 5 common mistakes and their countermeasures.
- Migrating dirty data. Duplicate equipment, approximate addresses and wrongly dated contracts pollute the schedule. Countermeasure: clean before import, with a data owner on the service side.
- Neglecting technician adoption. A complicated app brings paper back. Countermeasure: pilot with lead users, short on-site training, feedback collected every week.
- Underestimating van stock. Launching the ERP without target stocks or an opening count makes issues wrong. Countermeasure: opening count per van and a target stock defined before go-live.
- Customising too early. Each custom development lengthens the project and complicates upgrades. Countermeasure: standard first, gaps justified by a quantified gain.
- Forgetting recurring billing and indexation. Contracts migrate but due dates get skipped. Countermeasure: dedicated acceptance test on a sample of contracts, compared with the previous year’s billing.
Going Further
To dig deeper, read our guide on fit-gap workshops and the one on warranty and after-sales returns. To compare two or three solutions on your scenarios, download our ERP evaluation grid: 30 criteria scored out of 100, to complete with your trade requirements (equipment base, van stock, contracts). You can also receive our next sector guides by subscribing to the newsletter from the page footer.