A foundry does not make a part: it melts a charge, pours it, and only then finds out, sometimes after machining at the customer’s site, whether the part is sound. A forge heats bars, strikes them, then sends them to heat treatment. A heat treater sells a furnace cycle on a part it does not own. In all three trades, the material changes state, energy weighs heavily in the product cost, and defects often stay hidden until the end of the chain.
A generic ERP thinks in linear production orders, stable bills of materials and marginal scrap. Here, production runs in batches, the bill of materials depends on the heat, and a single rejected part can contaminate a whole furnace load. This guide is written for operations directors, CFOs and CIOs of foundries, forges and heat treaters with 50 to 500 employees. It describes what the ERP must handle, proposes a 12-requirement specification and compares the main families of solutions.
For sheet metal, fabrication and machining (cold processes, quoting and subcontracting), see our guide to ERP for sheet metal fabrication and machining. Here, we cover hot processes.
What Makes the Trade Different: Batches, Molten Metal, Scrap, Energy
Four characteristics come up in every project, and they turn into functional gaps if they are poorly scoped.
Batch Production, Not Single Parts
A heat (a pour) or a furnace load produces a homogeneous batch: several parts from the same melt, the same charge and the same thermal cycle. The unit of control is therefore not the individual production order but the batch, which carries the chemical composition, temperature, times and operators. The ERP must be able to create, split and merge batches without losing the link between the finished part and its history.
Material That Transforms
In a foundry, incoming material is scrap, ingots, ferro-alloys and returns (gates, risers, rejected parts that are remelted). The resulting melt has no original item reference: it is a recipe, adjusted during melting based on spectrometer analysis. Internal returns are both a saving and a complication: you must manage their stock, usage and valuation.
Costly, Late-Detected Scrap
Porosity, shrinkage or a crack is discovered at the end of the process, sometimes after non-destructive testing, sometimes at the customer’s. The cost of poor quality is not limited to the part: it includes the molten metal, the energy already consumed, fettling, heat treatment and machining done on a part that will eventually be scrapped. An ERP that values scrap at material cost only underestimates the problem.
Energy That Shapes the Cost
Melting furnaces, holding furnaces, heat-treatment furnaces: gas and electricity sit at the core of the product cost, and cycles cannot be paused for free (holding temperature, reheating). To go further, read our article on energy cost management and Scope 2 in industry (in French).
Heat Traceability and Material Certificates
Heat Numbers and Batches
The heat number is the keystone of traceability. Every part must be linked to the heat it came from, and every heat to its incoming materials (ingot lot, scrap, additions). The ERP must handle this two-way traceability:
- Forward: from a heat, find all parts, customers served and shipments.
- Backward: from a defective part, trace back to the heat, the furnace, the materials and the operators.
This is the same logic as a product recall: see our guide to crisis management and lot traceability.
Chemical Analyses and Mechanical Properties
Spectrometer results (chemical composition) and mechanical tests (tensile, hardness, impact) must be attached to the heat or to the heat-treatment batch, not keyed by hand into a separate file. The ERP, or the MES that feeds it, must be able to compare these results with the tolerance of the ordered grade and block shipment in case of deviation.
3.1 Certificates and Customer Requirements
The EN 10204 standard defines the types of inspection documents for metallic products. A 3.1 certificate is issued by the manufacturer and validated by an authorised representative independent of the manufacturing department; it includes the chemical analysis, mechanical properties and non-destructive test results for the heat and the delivered batch (explanation of EN 10204 certificate types). A 3.2 certificate adds validation by an independent third party.
The ERP should therefore generate this certificate automatically from heat and inspection data, with a template per customer, and keep the archive. For automotive, the IATF 16949 standard and material data reporting (IMDS) also require documented control of special processes: see our guide to automotive ERP, IATF 16949 and IMDS. For aerospace, AS9100 requirements come on top, detailed in our article on aerospace and defense ERP, ITAR and AS9100.
Tooling Management: Patterns, Molds, Dies
A Fleet of Assets to Track
Foundry patterns, core boxes, permanent molds, forging dies, inspection fixtures: each tool has an owner (the customer or the company), a location, an estimated life and a maintenance history. The ERP must manage them as assets linked to items, not as simple stock references.
Life and Wear
A forging die wears with every strike, a permanent mold degrades with every pour. The hit or pour counter must be fed continuously to trigger preventive maintenance (repair, rebuild, replacement) before dimensional drift generates scrap. Tooling cost must then be amortised over the parts produced, according to a chosen rule: per part, per hit or flat rate.
Customer-Owned Tooling
When the tooling belongs to the customer, it must be identified as such, insured, inventoried and returned on request. Many OEMs audit this point. The ERP must trace movements (receipt, loan to a subcontractor, return) and prevent customer tooling from being used for another order.
Furnace and Line Scheduling
Batches, Sequences and Capacity Constraints
The furnace is the critical resource. It imposes rules that standard scheduling modules do not know:
- grouping compatible parts (same cycle, same grade) into one load;
- respecting a sequence (for example, low-temperature parts before high-temperature parts to limit reheating);
- capacity in weight or volume, not in hours;
- ramp-up, soak and cooling times that determine the next availability.
The ERP must provide finite-capacity scheduling on furnaces, with load visualisation and the ability to reschedule when a rush order arrives.
Molding and Forging Lines
On a molding line or a forging press, scheduling means chaining runs while minimising tooling changes. Pattern changeover, die preheating and bringing the bath up to temperature are non-productive times that must be modelled. For general planning principles, see our guide to MRP II and production planning (in French).
The Heat Treater’s Case
The heat treater works on the customer’s part: it receives, loads, treats, inspects and ships back. The ERP must manage customer-supplied material (parts held on consignment), the treatment routing (cycle, atmosphere, quench, temper), recording of the actual furnace cycle and the associated treatment certificate. Cycles are billed by weight, by load or by duration.
Part Costing: Material, Energy, Scrap, Rework, Subcontracting
The cost of a foundry or forge part is made up of blocks that the ERP must isolate to be manageable:
| Cost block | What to capture |
|---|---|
| Material | Actual charge, alloy additions, valued returns, melt loss |
| Energy | Gas and electricity per furnace, holding included |
| Labor | Melting, molding or forging, fettling, inspection |
| Tooling | Amortisation or wear per part |
| Scrap and rework | Full cost of the scrapped part at the stage where it is detected |
| Subcontracting | Outsourced heat treatment, machining, coating |
Scrap: Value It at the Right Stage
A part scrapped after machining has consumed more than a part scrapped after pouring. The ERP must record scrap at the actual stage, with the reason (porosity, shrinkage, dimensional defect), so that the cost of poor quality is visible by cause and by customer. This tracking feeds continuous improvement and the commercial discussion.
Material and Energy Indexation in Quotes
The price of steel, alloys, gas and electricity moves. Long-term contracts with an OEM must therefore include indexation clauses, and the ERP must apply them: adjustment formula, reference index, reference date, price recalculation at delivery. Without this, the price gap accumulates as a silent loss. For the method of calculating real cost against standard cost, read our article on standard costing vs actual costing.
Heat-Treatment and Machining Subcontracting
A foundry part often goes to a heat treater, then to a machine shop, before coming back for inspection. The ERP must manage these subcontracting flows (dispatch, tracking of work in progress at the third party, receipt, invoicing): see our guide to ERP and industrial subcontracting.
CBAM and Carbon Footprint
Cast iron, iron and steel products are among the goods covered by the EU Carbon Border Adjustment Mechanism. If you import material or export to customers subject to these obligations, the ERP must carry emissions data per batch. We cover this in our article CBAM and ERP: carbon declaration at EU borders (in French). Check the exact scope of your customs codes before sizing the work.
Shop-Floor Integration: MES, Weighing, Spectrometer, CMMS
A foundry or forge ERP that does not connect to the shop floor will not be fed, and therefore will not be reliable. Four integrations come up again and again:
- Weighing: weighing of charges, parts, gates and scrap, with automatic transfer of the weight to the batch.
- Spectrometer: upload of the melt’s chemical analysis, attached to the heat.
- MES: tracking of furnace cycles, times, stoppages and process parameters. The choice between integrated and standalone MES is covered in our comparison integrated MES vs standalone MES.
- CMMS: maintenance of furnaces (refractories, burners, thermocouples) and presses. A drifting furnace produces scrap before it breaks down. See ERP and CMMS.
The golden rule: the ERP remains master of orders, batches, costs and certificates; the MES and the PLCs remain masters of real time.
A 12-Requirement Specification
- Batches and heats: creation, splitting, merging and forward and backward traceability, with no break.
- Melt recipes: charge, additions, returns, adjustments after analysis.
- Analyses and tests: attaching chemical and mechanical results to the heat or batch, with automatic blocking on deviation.
- Certificates: generation of 3.1 certificates (EN 10204) by customer template, archiving and search.
- Tooling: assets linked to items, ownership, hit counter, maintenance, return.
- Furnace scheduling: finite capacity in weight or volume, load grouping, sequences.
- Treatment routings: cycles, atmosphere, quench, temper, with recording of the actual cycle.
- Scrap: entry by reason and by stage, valuation at full cost.
- Part costing: material, energy per furnace, labor, tooling, scrap, subcontracting.
- Indexation: material and energy clauses applied to quotes, orders and invoices.
- Shop-floor integrations: weighing, spectrometer, MES, CMMS.
- Compliance: customer and sector requirements (IATF 16949, aerospace), emissions data if CBAM applies.
Solution Families and Selection Criteria
| Family | Strengths | Watch points |
|---|---|---|
| General manufacturing ERP | Finance, purchasing and sales coverage; broad ecosystem | Batches, heats and furnaces often need to be specified or developed |
| Metals-specific ERP | Native batches, heats, certificates and furnaces | Smaller vendors, back-office coverage sometimes lighter |
| MES + ERP | Real-time shop floor, cycle recording | Two tools to integrate and maintain |
How to Choose
- Mid-sized single-site foundry or forge: favour a metals-specific ERP or a general manufacturing ERP with an industry layer proven on comparable references.
- Multi-site group with consolidated finance: general manufacturing ERP, complemented by an MES on the furnaces.
- Heat treater: look first for customer-supplied material management, cycles and treatment certificates.
Whatever the profile, demand a demonstration on your data: a heat with returned material, a furnace load grouping three orders, a generated 3.1 certificate, a part scrapped and valued at the machining stage. A vendor who does this live saves you months of development.
Implementation Pitfalls
- Tooling data migration: hit counters unknown or wrong. Plan a baseline inventory before cutover.
- Half-digital traceability: an analysis written on paper and rekeyed breaks the chain. Connect the spectrometer.
- Smoothed energy cost: spreading gas pro rata to hours hides the furnaces that cost a lot.
- Late scrap entry: without hot entry by operators, the cost of poor quality stays theoretical.
- Shop-floor change management: if data entry is seen as a burden, it will be bypassed.
Going Further
If your business is close to plastics processing (molds, presses, materials), read our guide ERP for plastics injection molding: molds, presses and part cost. To scope your project, download our ERP evaluation grid or contact us: we will help you prepare the specification and the demonstration on your own data.